2009年1月20日星期二

Spruce Falls (Saskatchewan)

Spruce Falls was the local name for a small waterfall where the Swan river empties into Duck lake in northeastern Saskatchewan, near the Manitoba boundary. It is located at 55°37′ N and 102°7′ W.

The Swan river, about four miles in length, is the outlet channel from Birch lake into Sisipuk (Duck) lake. The water eventually flows into the Churchill River. It has a drainage area of 700 sq. mi. consisting of a number of lakes, chief among which are Mari lake, 19 sq. mi. Barrier lake, 55 sq. mi.and Birch Burntwood lake, 16 sq. mi.

In 1928, Spruce Falls became the site of a temporary power plant supplying the Island Falls, Saskatchewan hydroelectric power development on the Churchill River.


Spruce Falls and the Island Falls Power Development
A large amount of power is required for construction purposes on a job the size of the Island Falls development. As steam and gasoline units could be used only to a minor extent owing to the high cost of transporting fuel, the only alternative was to find a site where hydroelectric energy could be generated. Engineers for the Churchill River Power Company determined that Spruce Falls, about 13½ miles (22 km) northeast of Island Falls, was suitable.

By utilizing the natural fall of twenty-five feet at Spruce Falls in addition to a fifteen-foot high timber dam which impounded a small forebay, a head of forty feet was developed. Water from the head pond was conveyed to generator turbines by two wood stave pipes seven feet wide and ninety feet long.

The Power House
The Spruce Falls temporary power-house was a frame building on the shore of Sisipuk lake. It contained two small generating units and complementary equipment. These two 1,250 h.p. vertical-type turbines, with propeller-type runners, were direct connected to 1,000 kVa generators delivering power at 600 volts, 3 phase, 60 cycles to a bank of transformers.

The transformer bank was placed apart from the power-house and protected by a lightning arrester and fuses. Rated at 2,000 kVa, these transformers stepped the voltage up to 26,400 volts for transmission to Island Falls. There, a sub-station stepped the current down to 600 volts for two motor-generator sets which supplied current for the electric locomotives used in hauling earth, concrete and other construction materials.

Completion of the Project
Work on the temporary power plant was started on October 4, 1928. Its operation began on March 20, 1929, and continued without interruption until No. 1 Unit at Island Falls took up the load on June 5, 1930. Subsequently, the Spruce Falls plant was dismantled and, under very difficult freighting conditions due to snow and weak ice, the two small generating units were brought to Island Falls, where they were permanently installed in 1933.

During the period of operation this plant supplied 4,698,000 kWh of electrical energy for construction purposes, at an average cost of 4.35 cents per kWh.

AC Travel Charger


Phone Solar Charger


Industrial Battery Charger


oem battery charger


nimh smart charger


Solar Battery Chargers


Portable Battery Charger


NI-MH Battery Charger


Car Power Adaptor


12V Car Charger


PDA Travel Charger


Phone Car Charger


mp3 solar charger


12V Battery Chargers


Agu Fuse Holder


anl fuse holder


Universal Travel Charger


dell battery charger


dc car charger


ag13 button battery


dell cpi battery

没有评论:

发表评论